Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 8 results ...

Al-Sudairi, A A (2007) Evaluating the effect of construction process characteristics to the applicability of lean principles. Construction Innovation, 7(01), 99–121.

Dobbelsteen, A v d, Arets, M and Nunes, R (2007) Sustainable design of supporting structures: Optimal structural spans and component combinations for effective improvement of environmental performance. Construction Innovation, 7(01), 54–71.

Eaton, D, Akbiyikli, R, Lemos, T d, Gunnigan, L, Kutanis, R O, Casensky, M, Ladra, J and Sawalhi, N E (2007) An examination of the suitability of a UK PFI model within the Czech Republic, the Republic of Ireland, Palestine (Gaza-West Bank), Portugal and Turkey. Construction Innovation, 7(01), 122–42.

  • Type: Journal Article
  • Keywords: Cross-cultural studies; Partnership; Private finance
  • ISBN/ISSN: 1471-4175
  • URL: http://www.emeraldinsight.com/10.1108/14714170710721331
  • Abstract:
    Purpose – The objective of this research is to identify the cross-cultural similarities and differences of the implementation of the UK PFI procurement process in different contexts. Design/methodology/approach – The research methodology adopted was the SLEEPT approach. The identified features are examined from source material of various projects within the stated nations. A Delphic approach of confirmation by national collaborators from each country is utilised. Confirming and disaffirming features are examined utilising exogenous cultural drivers. Findings – The conclusion of this research identifies cross-cultural features of six different cultures presented as a “cultural compass” which will inform the development of future private finance initiative (PFI)/public private partnership (PPP) projects. The impact of this research will have implications for the appreciation of cultural similarities and differences of national “construction cultures” for effective project delivery of future PFI/PPP projects. Originality/value – This paper offers an approach that can be generalised for adoption by nations considering the introduction of PFI as a procurement process. Record 35.

Fu, C, Kaya, S and Aouad, M K G (2007) The development of an IFC-based lifecycle costing prototype tool for building construction and maintenance: Integrating lifecycle costing to nD modelling. Construction Innovation, 7(01), 85–98.

Hao, J L, Hills, M J and Huang, T (2007) A simulation model using system dynamic method for construction and demolition waste management in Hong Kong. Construction Innovation, 7(01), 7–21.

Linden, K A C v d, Kurvers, S S R, Raue, A A K and Boerstra, A A C (2007) Indoor climate guidelines in The Netherlands: Developments towards adaptive thermal comfort. Construction Innovation, 7(01), 72–84.

Tenpierik, M J, Cauberg, J J M and Thorsell, T I (2007) Integrating vacuum insulation panels in building constructions: an integral perspective. Construction Innovation, 7(01), 38–53.

Timmeren, A v and Sidler, D (2007) The sustainable implant: Decentralised sanitation and energy reuse (Desaer) in the built environment. Construction Innovation, 7(01), 22–37.